Configurator

Start from your consumption, not from a product list.

Two doors in. Tell us what you run and for how long, or give us the spec you have already settled on. Either way you get a sized pack, the arithmetic behind it, a tax-correct price valid for seven days, and the payback against whatever you are running today.

Connected load80 kW
Backup needed4 hours
What you need
297.58 kWh
Nominal energy
243.48 kWh
Out of the battery
56 kW
Continuous power
  1. 0180 kW connected x 0.7 diversity = 56 kW actually running.
  2. 0256 kW x 4 h = 224 kWh at the load.
  3. 03Divided by 0.92 inverter efficiency = 243.48 kWh out of the battery.
  4. 04At 90% depth of discharge and 1.1x ageing headroom = 297.58 kWh nominal.
  • · This consignment is over 200 kg, so freight is quoted per booking rather than computed.

What we would build

The best value we would build, plus a larger and a smaller option. Pick one and the price, freight and payback below follow it.

Quote UP/Q/2609/42003

3 × HV String 358-280

₹37,17,000
incl. GST · valid to 24 Sept 2026
HV String 358-280 × 3
₹31,50,000
Freight quoted per consignment. 2925 kg needs a part-load or full-truck booking with a Class 9 carrier. We quote these per consignment rather than guess.
Taxable value
₹31,50,000
CGST @ 9%
₹2,83,500
SGST @ 9%
₹2,83,500
Total
₹37,17,000
How this one is bought
  • Booking depositNow, to reserve the build slot₹25,000
  • Advance on confirmationAgainst proforma, by NEFT or RTGS₹14,61,800
  • Balance before dispatchBefore the consignment leaves our works₹22,30,200

UN3480 · Class 9 — Miscellaneous dangerous goods. Surface freight only — nothing we sell can travel by air. This consignment needs an e-way bill; we raise it before dispatch.

Open the build sheet

What is this replacing?

Every number below is yours to change. The arithmetic is shown at the bottom.

₹30
Costs you today, per kWh
₹10.56
With this pack, per kWh
2 years
Months to payback
Energy cycled a year
81,288 kWh
Saving a year
₹15,80,239
Lifetime saving over 20 years
₹3.16 Cr
Show the arithmetic
  1. 01Diesel: 0.28 L/kWh x ₹100/L = ₹28/kWh of fuel.
  2. 02Plus ₹0.4 lube and ₹1.6 maintenance = ₹30/kWh from the genset.
  3. 03Battery: grid at ₹9.5/kWh over 0.9 round-trip efficiency = ₹10.56/kWh delivered.
  4. 0481288 kWh a year x ₹19.44/kWh saved = ₹1580238.72.
  5. 05₹3150000 capex over ₹1580238.72 a year = 24 months to payback.

Capex used: ₹31,50,000 ex-GST, over a 6,000-cycle life at 270.96 kWh usable per cycle. A business buyer takes the GST as input credit, which is why the payback is computed ex-GST.

Prices come from price book pb-2026-09 and are valid for seven days from 17 Sept 2026. Cell prices move; a quote past its validity is re-struck rather than honoured. Freight assumes ground-floor delivery with unloading by the consignee. Installation, civil work and any inverter or PCS are quoted separately.